Licensed & insured · Louisville, KY & Southern Indiana

Call or text (502) 821-9118

Bathrooms

Bathroom Remodels In Louisville

Tiled walk-in showers, freestanding tubs, double vanities and waterproofing done properly behind the tile.

What We Do

Bathrooms Built To Stay Dry

A bathroom is the least forgiving room in a house. Water finds every shortcut, so we build the parts you will never see — membrane, slope, blocking and ventilation — to the same standard as the tile you will look at every morning. From a single hall bath to a full primary suite, the work is done by our own crew, on one schedule, with the site cleaned at the end of every day.

● Curbless and tiled walk-in showers
● Freestanding and drop-in tubs
● Double vanities and LED mirrors
● Custom niches, benches and glass
● Heated floors and upgraded venting
● Full waterproofing and code plumbing

Bathroom Gallery

What a full bathroom with us covers

Demolition and haul-off, framing changes, waterproofing, tile, the shower pan or tub, vanity and tops, plumbing and electrical, ventilation, glass, paint and the punch list. The same crew does the whole thing rather than handing it between trades who blame each other later.

Waterproofing is the part you never see

A bathroom is the one room in the house built to get soaked every day, and nearly every failure we are called in to fix traces back to what happened underneath the tile. Sheet or liquid membrane behind the board, a pan built to the right slope, corners and changes of plane treated properly, and the vent actually ducted to the outside rather than into the joist bay. Tile hides all of it, which is exactly why it is where corners get cut. Ask any contractor to tell you what waterproofing system they use by name. Our Louisville bathroom cost guide goes through the ranges.

What older Louisville bathrooms throw at you

Second-floor baths in pre-war houses are usually stacked over the kitchen drain, so moving a toilet is a bigger conversation than moving a vanity. Cast iron stacks, galvanised supply lines that have narrowed to a straw, and joists that were notched by somebody in 1960 all turn up. We would rather find that on the walkthrough than on day four.

How long you will be without it

A single full bathroom is normally a matter of weeks, not months, and the honest answer depends on tile lead times and whether anything moves. If you only have one bathroom, say so early — it changes how we sequence the work.

31 photos · click any image to view full screen

Ready For A Better Bathroom?

Free on-site estimates across Louisville and Southern Indiana.

Call or Text Free Estimate